Building EUI Manager
SEEC
Resources
About
FAQ
ARB
ENG
Log Out
Portals
Admin
Projects
Dashboard
Project List
Admin menus
Users
Label Manager
Weather, Region & City
Materials & Assemblies
Materials
Construction Assembly
Window/Skylight/Door
Existing Buildings
Envelope
HVAC
Lighting
Equipment
SBC Tables
SBC 601
SBC 602
Schedules
Simulation Settings
Help Center
Admin
SBC Tables
SBC 602
Table 5.1 (Surface)
List of Table 5.1 (Surface)
Table 5.1 (Surface)
Table 5.1 (Fenestration)
Table 5.1 A
Table 5.1 B
Lighting
HVAC
Zone
Category
Opaque Element
Assembly Max. U-Value
Insulation Min. R-Value
Action
Zone 3
Opaque Doors
All assembly
2.839
Zone 2
Opaque Doors
All assembly
2.839
Zone 3
Grade Floor
Slab-on-Grade-Floors
0.90
2.6
Zone 2
Grade Floor
Slab-on-Grade-Floors
0.90
2.6
Zone 3
Floors
Other
0.188
5.3
Zone 2
Floors
Other
0.188
5.3
Zone 3
Floors
Steel-Joist
0.296
3.3
Zone 2
Floors
Steel-Joist
0.296
3.3
Zone 3
Floors
Mass
0.496
1.5
Zone 2
Floors
Mass
0.496
1.5
Zone 3
Walls, Below-Grade
Below-Grade Wall
0.678
1.3
Zone 2
Walls, Below-Grade
Below-Grade Wall
0.678
1.3
Zone 3
Walls, Above-Grade
Mass
0.611
1.52
Zone 2
Walls, Above-Grade
Mass
0.611
1.52
Zone 3
Roofs
Insulation Entirely above Deck
0.397
2.38
Zone 2
Roofs
Insulation Entirely above Deck
0.34
2.80
Zone 1
Opaque Doors
All assembly
2.839
Zone 1
Grade Floor
Slab-on-Grade-Floors
0.90
2.6
Zone 1
Floors
Other
0.486
5.3
Zone 1
Floors
Steel-Joist
0.296
3.3
Zone 1
Floors
Mass
0.496
1.5
Zone 1
Walls, Below-Grade
Below-Grade Wall
0.678
1.3
Zone 1
Walls, Above-Grade
Mass
0.611
1.52
Zone 1
Roofs
Insulation Entirely above Deck
0.272
3.54
Are you sure
Are you sure you want to delete the data?